Tyler Gentry
Fall 09
E-Studio
| Assignment | Date | Description |
| Assignment 01 | 09-04-09 | Houston / Bayou Research and Templates |
| Assignment 02a | 09-11-09 | Precedent Watershed Research - Boston, MA |
| Assignment 02b | 09-11-09 | Houston Watershed Research |
| Assignment 03a | 09-18-09 | Precedent Watershed Research - Mobile, AL |
| Assignment 03b 01 | 09-18-09 | Diagram - Flooding |
| Assignment 03b 02 | 09-18-09 | Diagram - Design to Flood |
| Assignment 03b 03 | 09-18-09 | Diagram - Design to Prevent Flood |
| Assignment 03c | 09-22-09 | Houston Research Development - Flood Prevention Products |
| Assignment 04 | 09-25-09 | Pier and Beam Research |
| Assignment 05a | 09-29-09 | Design Solution Evaluation |
| Assignment 05b | 10-02-09 | Conceptual Development + Parti + Diagrams |
| Assignment 05c | 10-02-09 | Precedent Study - Water Towers, Vacuums, and Sump Pumps |
| Assignment 06a | 10-06-09 | Flood Analysis |
| Assignment 06b | 10-06-09 | Case Study Area |
| Assignment 06c | 10-06-09 | Design Development for Case Study Area |
| Assignment 06d | 10-09-09 | Map Assignment |
| Assignment 06e | 10-09-09 | Diagram Development |
| Assignment 06f | 10-09-09 | Pragmatic Diagram |
| Assignment 06g | 10-09-09 | Prelim 3d Axo Diagram 01 |
| Assignment 06h | 10-09-09 | Abstract |
| Assignment 07a | 10-13-09 | Model Design Development Progress |
| Assignment 07b | 10-16-09 | Detail Development - At End Point of vacuum tentacles |
| Assignment 07c | 10-16-09 | Adapting Design to Houston 1 |
| Assignment 07d | 10-16-09 | Applying Design to Houston 2 |
| Assignment 07e | 10-16-09 | Model Design Development Progress - Rendering |
| Assignment 08a | 10-23-09 | Site Plan - PDF |
| Assignment 08b | 10-23-09 | Site Plan - Web + Zoom In |
| Assignment 08c | 10-23-09 | Rendering within Context |
| Assignment 08d | 10-23-09 | Rendering Diagram |
| Assignment 08 | 10-23-09 | Mid-Term Presentation Board (PDF Version is 14 MB) |
| Assignment 09a | 10-30-09 | Water Treatment Research - Houston |
| Assignment 09b | 10-30-09 | Storyboard for Studio Project including status updates |
| Assignment 10a | 11-06-09 | Rethink Design - One |
| Assignment 10b | 11-06-09 | Rethink Design - Two |
| Assignment 10c | 11-06-09 | Back to the Macro - Revised Map |
| Assignment 10d | 11-06-09 | Rethink Design - What do water storage units typically look like? |
| Assignment 10e | 11-06-09 | Rainfall Research and assessment of required rainfall collection. |
| Assignment 10g | 11-06-09 | Connecting to existing items within city |
| Assignment 10h | 11-06-09 | Rethink Design - The tentacles |
| Assignment 11a | 11-10-09 | Redesign - Project "H2Go" |
| Assignment 11b | 11-10-09 | Redesign - Project "H2Go" Interactive DWF |
| Assignment 11c | 11-13-09 | Revised Presentation - Inc. bayou calculations and Design Criteria |
| Assignment 12a | 11-13-09 | Morphesis Diagram |
| Assignment 12b | 11-17-09 | Redesign 02 - Images |
| Assignment 12c | 11-20-09 | Redesign Images within Context |
| Assignment 12d | 11-20-09 | Redesign 3 - Forming the tank to the space |
| Assignment 12e | 11-20-09 | Redesign 3 - The model as a Interactive DWF |
| Assignment 12f | 11-20-09 | Back into the context |
| Assignment 12g | 11-20-09 | Calculating Required Containment |
| The Written | 11-20-09 | The Written - Houston + Flooding Download Word File |
| The Written Revised | 11-20-09 | The Written - Revised Download Word File |
| FinalAssignment_a | 12-01-09 | Front and Side Elevations, Plan, Section |
| FinalAssignment_b | 12-01-09 | PowerPoint Presentation Preliminary, still under way |
| FinalAssignment c | 12-02-09 | Diagram Rendering |
| Final Board 1 | 12-09-09 | Optimized Presentation Board 1 |
| Final Board 2 | 12-09-09 | Optimized Presentation Board 2 |
| Final Board 3 | 12-09-09 | Optimized Presentation Board 3 |
| PowerPoint Presentation | 12-09-09 | PowerPoint Presentation |
| Writing Portion | 12-09-09 | Writing Portion for booklet |
| Storyboard | Updated Constantly | Storyboard with progress updates and links |